TERMS & CONDITIONS
(a)
The
sheeting will be of type specified of .42mm BMT for roofs and .35 For walls and
is
Guaranteed by BHP Properties
close to the coast contact BHP for information
(b)
Roofing
Guarantee for workmanship is for one year providing gutters have been kept
clean
And no other persons have altered the roof in anyway ie (installation of Aerials Satellite dishes or cleaning of
chimneys)
(c)
No
structural work or timberwork to the roof will be carried out unless stated in
the contract.
(d)
Any delays caused by White Ant damage or
structural problems that may arise during removal of roofing will need to be
resolved promptly. Or extra charges may occur.
(e)
It is
understood that when removing old roof cladding and installing new iron that it
will be only be as level and straight as the structural roof timbers will
allow. All efforts will be made to make new roof as aesthetic pleasing as
possible.
(f)
It is
acknowledged by the owner that some superficial damage might occur during the
works being carried out Paint flaking and small cracks might appear due to
movement when heavy asbestos or old roof
tiles are removed this will be the responsibility of the owner
(g)
Roof
insulation all ready in roof space will not be removed unless stated in the
contract in asbestos roof replacement. Areas around penetrations that are
visible if contaminated will be removed Replaced of insulation will be an extra
unless stated in contract
(h)
Keybrook
Utility Services to be allowed clear and unrestricted access to the work site
during the duration of work or extra charges may be enforced.
(i)
Only
personnel of Keybrook Utility Services will be permitted on the site during the
duration of work
GENERAL CONDITIONS DEMOLITION & ASBESTOS
REMOVAL
(a)
The
owner will supply proof of ownership of the property prior to commencement of
(Demolition work mainly)
(b)
Power
and other services will have to be disconnected by the owner and all costs paid
(Demolition work mainly)
(c)
Baiting
for rodents will be an extra some Shires or Councils require this prior to
(Demolition mainly)
(d)
Copies
of Permits if being obtained by the owner must be supplied to Keybrook Utility
Services before work will be commenced.
(e)
Plans
will be obtained for underground services and all care will be taken. Owners
and occupiers to provide additional knowledge of location of these services.
The owner will be responsible for services not marked
(f)
Materials
that are removed from the property will become the property of Keybrook Utility
Services unless it is arranged prior to the signing of the contract/acceptance
of the quote
(g)
The
owner or his workers will not hinder in any way the progress of the work being
carried out under this contract.
(h)
The
removal of Asbestos refers to sheeting only and not powder or lagging or
acoustic Asbestos
(i)
Asbestos
fences will be removed above & below ground as long as the asbestos can be
located
(j)
Storm
damage debris that has blown or fallen from roof. Tiles, asbestos, wood or
other debris will be cleaned up as much as possible but a %100 cannot be
guaranteed neither be found will be the ultimate responsibility of the owner
(k)
Asbestos
cement products will be removed to worksafe
Regulations. However a %100 cleanup cannot be guaranteed. Only
nails, wood or stripping is removed to remove the asbestos. If there is no asbestos on the nails the
nails may be left.
(l)
No
penalties to be enforced due to delays from too wet weather or adverse
conditions. It is the owner’s responsibility to adhere to Shire or Bush Fire
regulations.
GENERAL CONDITIONS & PLUMBING & GAS
(a)
All
Plumbing & Gas work will be done to the relevant codes and regulations at
the time of installation
(b)
Power
and water needs to be supplied by owner.
(c)
Payments
to be made on time penalties may incur if not paid by due date
(d)
Material
delivered to the site will be become the property of the owner and damage
or vandalism is the responsibility of
the owner or Principal and will covered by their insurance
(e)
Clear
and unrestricted access to the work site during the duration of work or extra
charges may be enforced.
(f)
No
other piping Telephone cables Electric wiring
poles fencing will be put on the surface or underground were any
plumbing or drainage will be installed
(g)
Appointments
must kept on time and directions given must be able to be carried
out and lawful in their content
(h)
Directions
must be able to be carried out
misleading and false information
will be treated as a serious breach of the agreement
(i)
The job
will be ready to commence to the standards requested by Keybrook if these
conditions are not meet work will not be commenced & may be canceled i.e.:-
String lines will not be measured off & not taken as fixed points for
measurements
(j)
Disputes
a meeting between the disagreeing parties with a mediator will be held within 5
days to settle disputes
(k)
Failure
to comply with the above conditions will cause extra charges or cancellation of
the agreement & Keybrook Holding Pty Ltd reserve the right to do so
(l)
Keybrook
Utility Services reserve the right “under our duty of care to employees” to
suspend the works if conditions are deemed unsafe by Keybrook Utility Services.
(m)
Signing
of the Quote or supplying of order
numbers or the commencement of the work is acceptance of the terms and conditions in full